Utilities Unlimited, Inc. was contracted by a National Builder & Land Developer to construct the underground water, sewer and storm drain infrastructure for the new residential community of The Willows. Utilities Unlimited, Inc was chosen for this project due to the expedited schedule and the complexity of the sewer bypass system that was to be installed and maintained by UUI, as the old sewer was converted over to the newly installed sewer system.
An upscale townhouse community in Millersville, Maryland, The Willows will be home to 105 units on more than 15 acres upon completion. The neighborhood’s residents will enjoy modern, energy-efficient homes and a strategic location with easy access to the area’s major commuting routes and interstates, as well as close proximity to local recreation and retail centers.
Learn more about the advanced fleet of equipment and technology that make our work below the surface a seamless operation.
- Sewer Pump Around
- 3,000 LF of 8” Sewer Main
- 20 Ea Sewer Manholes
- 105 Sewer House Connections
- 3,500 LF of 8” Water Main
- 15 EA Fire Hydrants
- 105 Water House Connections
- 3,000 LF of 15” – 36” RCP Storm Drain
- 58 EA Strom Drain Structures